Scheduled (published schedule data), not measured outages.

Method and sources

About the data

What this site shows

Roshni shows the load-shedding schedules that IESCO and K-Electric publish, and the planned shutdowns IESCO announces in press releases. These are plans, not measurements: a feeder listed as scheduled may have had power, and a feeder not listed may not have.

IESCO interruption levels

IESCO publishes a playbook: one schedule for each interruption level (2 to 12 hours a day). Its files never say which level is in force, so this site never assumes one. You choose the level.

Time

All times are Pakistan Standard Time (Asia/Karachi, UTC+5, no daylight saving). A window such as 22:35–02:05 crosses midnight; the end minute is not included.

Matching

Feeders are matched to census localities and press-release names by name only. A match's percentage is the name similarity after ignoring case, spacing and punctuation; 100% means identical names, which are accepted automatically. Other matches are decided by written rules, then by a language model choosing only among listed candidates, then by Claude; each shows its confidence, who accepted it and why. Unmatched names are shown as printed.

Sources and effective dates

SourceFileEffective fromLabel on the source pageHow the date was set
Islamabad Electric Supply Company (IESCO): load-shedding schedule by interruption level6 files
  • iesco-ajk-sep26.xlsx
  • iesco-attock-sep26.xlsx
  • iesco-chakwal-sep26.xlsx
  • iesco-islamabad-sep26.xlsx
  • iesco-jhelum-sep26.xlsx
  • iesco-rawalpindi-sep26.xlsx
2026-01-14Sep-2026

HTTP Last-Modified (file states no date)

K-Electric: feeder list (loss categories as published)
  • kelectric-feeder-list.pdf
2026-07-06

HTTP Last-Modified (file states no date)

K-Electric: load-shed schedule
  • kelectric-load-shed-schedule.pdf
2026-08-05LSMnew-PDF-Aug-5th

Applies from 2026-08-05 (file name and HTTP Last-Modified); tentative per K-Electric disclaimer; published before the 2026-09-11 load-shedding directive, so it may not reflect it

Islamabad Electric Supply Company (IESCO): planned shutdown press releasesIESCO press releases (70 releases)2026-07-16 to 2026-10-18The shutdown dates printed in each release
National Electric Power Regulatory Authority (NEPRA): Performance Evaluation Reports of the distribution companies7 annual reports (editions 2016-17 to 2024-25)Section 3.6 tables: load-shedding hours each company reported to NEPRA
National Electric Power Regulatory Authority (NEPRA): order on K-Electric under section 27COrder dated 2026-08-31 (PDF)2026-08-31NEPRA's analysis of K-Electric's outage data for its listed feeders; period not stated
Islamabad Electric Supply Company (IESCO): monthly maintenance schedules18,737 announced windows, one workbook per circleThe dates and times printed in each workbook
News headlines: Dawn, Business Recorder, The Express Tribune, Associated Press of PakistanRSS feeds, checked every 3 hoursLoad-shedding headlines only: headline, outlet, date and link

When a file states no date, its effective date is when the server says the file last changed. That can differ from the label on the source page: IESCO labels its schedule files Sep-2026, but the files were last changed on 2026-01-14, so the schedule may have applied since then.

Attribution

  • Load-shedding schedules and press releases: Islamabad Electric Supply Company (IESCO), iesco.com.pk
  • Feeder list and load-shed schedule: K-Electric, ke.com.pk
  • Census 2023 tables: Pakistan Bureau of Statistics
  • Planned-maintenance schedules: IESCO, iesco.com.pk/maintenance-schedule
  • Load-shedding hours reported by distribution companies: National Electric Power Regulatory Authority (NEPRA), Performance Evaluation Reports, nepra.org.pk

Disclaimer

Not affiliated with IESCO, K-Electric, NEPRA or PBS. Schedules are published plans, not measured outages; IESCO schedules are a scenario playbook by interruption level; NEPRA figures are what the companies reported.